Scopus
Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry
International Journal of Advanced Manufacturing Technology · Haziran 2007
Makale Bilgileri
DergiInternational Journal of Advanced Manufacturing Technology
Yayın TarihiHaziran 2007
Cilt / Sayfa33 · 334-344
Scopus ID2-s2.0-34547626244
Özet
Higher quality and efficient production requires newer production methods and ideas. Newer methods contain newer problems that must be solved. As lean manufacturing was introduced to production environments, an important question occurred. What must be done to reduce the setup time? Shigeo Shingo tried to solve this problem by his methodology called SMED. In this text, an important success factor for setup times "sustainability" is taken into consideration. Here sustainability is used as keeping the success level achieved by using SMED at a desired point and not letting it to drop down. To achieve desired sustainability well-arranged standard procedures must be prepared. In this text an optimal changeover procedure is constituted with the aid of a predetermined time system (MTM-UAS) to standardize and preserve the improved changeover operations. © 2006 Springer-Verlag London Limited.
Yazarlar (2)
1
Mehmet Cakmakci
2
Mahmut Kemal Karasu
Anahtar Kelimeler
Changeover
Internal and external setups
MTM (Method time measurements)
(SMED) Single minute exchange of dies
Sustainability
TPM (Total Productive Maintenance)
Kurumlar
Dokuz Eylül Üniversitesi
Izmir Turkey
Metrikler
39
Atıf
2
Yazar
6
Anahtar Kelime